banner

Completion Environmental Protection Acceptance Monitoring Report (1)


Release time:

2020-03-07

Shandong Hongxin Yongda Foundry Technology Co., Ltd. 300,000 tons heavy casting and forging project (Phase I) Completion Environmental Protection Acceptance Monitoring Report Construction Unit: Shandong Hongxin Yongda Foundry Technology Co., Ltd. Preparation Unit: Shandong Provincial Product Quality Inspection Research Institute January 2018 Construction Project Completion Environmental Protection Acceptance Monitoring Report Lu Quality Inspection Environmental Acceptance Certificate [2018] No. 001

Shandong Hongxin Yongda Casting and Forging Technology Co., Ltd. 300,000 tons heavy casting and forging project (Phase I)

Completion environmental protection acceptance monitoring

Report

Construction unit: Shandong Hongxin Yongda Casting and Forging Technology Co., Ltd.

Preparation unit: Shandong Provincial Product Quality Inspection Research Institute

January 2018

Completion environmental protection of construction project

Acceptance monitoring report

Lu Quality Inspection Environmental Acceptance Certificate [2018] No. 001

Project name: Shandong Hongxin Yongda Casting and Forging Technology Co., Ltd. 300,000 tons heavy casting and forging project (Phase I)

Construction unit: Shandong Hongxin Yongda Casting and Forging Technology Co., Ltd.

Preparation unit: Shandong Provincial Product Quality Inspection Research Institute

January 2018

Construction unit: Shandong Hongxin Yongda Casting and Forging Technology Co., Ltd.

Legal representative: Wang Chuan Cai

Preparation unit: Shandong Provincial Product Quality Inspection Research Institute

Legal representative: Pei Hui Rong

Project leader: Wang Jing Min

Construction unit: Shandong Hongxin Yongda Casting and Forging Technology Co., Ltd.

Preparation unit: Shandong Provincial Product Quality Inspection Research Institute

Tel: 15665853102

Tel: 0531-89701987

Fax: 0531-61329922

Fax: 0531-89701987

PC: 250206

PC: 250102

Address: Guanzhuang Office, Zhangqiao District

Address: No. 31000, Jing Shi East Road, Jinan City

Monitoring undertaking unit: Shandong Provincial Product Quality Inspection Research Institute

Legal representative: Pei Hui Rong

Address: No. 31000, Jing Shi East Road, Jinan City

PC: 250102

Catalog

Preface 1

1.1 Acceptance content and purpose 3

1.2 Acceptance basis 4

1.3 Acceptance object 5

II. Overview of construction project 7

2.1 Project geographical location and layout 7

2.2 Surrounding situation of the project 10

2.3 Overview of project engineering 10

2.4 Construction content of the project 11

2.5 Main process flow and pollution generation links 15

2.6 Pollutant generation, treatment and discharge situation 17

2.7 Consumption of raw and auxiliary materials and material balance 23

2.8 Project change situation 25

III. Environmental impact assessment suggestions and requirements for environmental impact assessment approval 26

3.1 Environmental assessment conclusion and suggestions 26

3.2 Environmental assessment approval requirements 26

IV. Acceptance monitoring investigation 27

4.1 Purpose and scope of acceptance monitoring 27

4.2 Production condition inspection during acceptance monitoring period 27

V. Acceptance monitoring content 28

5.1 Waste gas monitoring factors and monitoring result evaluation 28

5.2 Wastewater monitoring factors and monitoring result evaluation 34

5.3 Noise monitoring 37

5.4 Total amount accounting 38

VI. Environmental risk prevention measures inspection and analysis 40

6.1 Waste gas risk prevention measures inspection 40

6.2 Environmental safety three-level prevention measures inspection 40

6.3 Inspection of measures to prevent hazardous waste temporary storage places 41

6.4 Inspection of primary rainwater and accident wastewater collection and drainage system 42

6.5 Inspection of various facilities for seepage prevention and corrosion prevention 42

VII. Environmental management investigation 43

7.1 Park planning environmental assessment and project industry positioning inspection 43

7.2 Environmental protection agency setup and environmental protection management system inspection 43

7.3 Emergency plan for sudden environmental events and inspection of environmental risk emergency materials 43

7.4 Management, operation and maintenance inspection of environmental protection facilities 44

7.5 Factory area greening inspection 44

7.6 Implementation of environmental monitoring plan 45

7.7 Environmental protection investment inspection 45

7.8 Investigation of disturbances during construction and trial operation period 45

VIII. Implementation of environmental assessment approval 46

IX. Public opinion survey 48

9.1 Survey time and method 48

9.2 Survey content 48

X. Conclusion and suggestions 51

10.1 Basic situation of the project 51

10.2 Environmental protection implementation situation 51

10.3 Acceptance conclusion 53

10.4 Acceptance suggestions 56


Attachment catalog

Attachment 1 Environmental impact report approval

Attachment 2 Environmental assessment conclusion and suggestions

Attachment 3 Waste steel slag, dust removal system dust export agreement

Attachment 4 Proof of relationship between Shandong Hongxin Yongda Casting and Forging Technology Co., Ltd. and New Era Heavy Industry Co., Ltd.

Attachment 5 Expert group opinion on the conformity of process technology policy of Shandong Hongxin Yongda Casting and Forging Technology Co., Ltd.

Attachment 6 Waste Mineral Oil Disposal Agreement

Attachment 7 Hazardous Waste Management System

Attachment 8 Environmental Protection Management System

Attachment 9 Explanation on the Unchanged Production Capacity of Shandong Hongxin Yongda Casting and Forging Technology Co., Ltd.

Attachment 10 Environmental Monitoring Agreement

Attachment 11 Daily Production Table During Acceptance Period

Attachment 12 Emergency Plan Filing Registration Form

Attachment 13 Anti-Seepage Certificate

Attachment 14 No Petition Certificate

Attachment 15 Oil-Containing Sludge Hazardous Waste Disposal Agreement

Attachment 16 Approval of the Application for Partial Content Change of the Environmental Impact Report of the 300,000 Tons Heavy Casting and Forging Project of Shandong New Era Metallurgical Equipment Co., Ltd.

Attachment 17 Groundwater Extraction Permit

Attachment 18 Project Rainwater and Sewage Flow Diagram

Attachment 19 "Completion Environmental Protection "Three Simultaneities" Acceptance Registration Form"